Large Commercial

Edward Air Force Base Solar Installation

3.4 MW

The single-axis tracker military solar power installation at Edwards Air Force Base, totaling 3.4 megawatts DC, was installed for no money down. The solar arrays are offsetting about 6% of the energy consumption at the North Base, South Base, and the Air Force Research Laboratory facilities.

Large Commercial

Newport Mesa Unified School District

3.2 MW

Solar to build 32 systems across its district ―among the most systems for any district in the country.

Utility

Silveira Ranch — Novato, CA

3.5 MW

Borrego EPC designed and built a 3.5 MW ground mount solar project developed and owned by Renewable Properties, a developer and investor of small-scale utility and community solar projects in the U.S.

Utility

American Canyon

3 MW

Borrego Solar recently completed construction on Napa County’s first feed-in-tariff project: the Renewable Properties’ 3MW AC ground-mounted tracker solar project in American Canyon.

Large Commercial

Liberty Union High School District

3 MW

The Liberty Union High School District is committed to focusing its resources on the achievement of academic and personal success for all students.

Utility

Taunton Municipal Light & Power

2.94 MW

Taunton Municipal Lighting Plant (TMLP) is a Massachusetts municipal electric lighting plant utility offering electric and Internet services to more than 36,000 customers in Taunton, Raynham, Berkley, North Dighton, and Lakeville.

Large Commercial

Ithaca College

2.9 MW

Borrego Solar co-developed, designed and built Ithaca College's 2.9 MW solar array while Greenwood Energy will own and operate it.

Utility

Southern California Edison in Desert Hot Springs

2.9 MW

Producing enough electricity annually to power 251 single-family homes

Utility

Southern California Edison PV Program

2.9 MW

Outside of Los Angeles, California, the commercial property owners of these warehouse and distribution centers are tapping into a new source of revenue from the sun. As landlords, they’re able to lease the space within their buildings to tenants, and through a partnership with solar developers who work in wholesales distributed generation (WDG), they’re able to lease their rooftops as well.

Large Commercial

San Diego Community College District

2.8 MW

At just over 2.8 MW DC, the San Diego Community College District solar power installation is one of the largest Community College District installation in the state.

Large Commercial

Tompkins Cortland Community College

2.6 MW

The 2.6 megawatt Tompkins Cortland Community College solar array, located on its main campus in Dryden, New York is expected to meet 90 percent of its electricity demand, generating the equivalent amount of electricity needed to power approximately 440 homes annually.

Large Commercial

Houghton College

2.6 MW

Houghton College put unused land to work by installing one of the largest solar arrays on a college campus in New York.