Large Commercial

Town of Ludlow Solar Landfill

2.6 MW

17 acres of undesirable capped landfill is now producing enough clean energy to save the community over $100,000 annually in energy costs.

Large Commercial

Assumption College Solar Array

2.5 MW

Founded in 1904, Assumption is a Catholic college known for its classic liberal arts curriculum and strong academic programs in business and professional studies.

Utility

Anaheim Convention Center

2.4 MW

This 2.4 megawatt roof-mounted solar array, owned by Anaheim Public Utilities (APU) and the City of Anaheim, is built atop the Anaheim Convention Center’s Exhibit Halls A, B, and C.

Large Commercial

Town of Easthampton Landfill

2.3 MW

At the beginning of 2012, the Easthampton Landfill fixed-tilt ballasted solar energy system was the largest of its kind in the state of Massachusetts, totaling 2.3 megawatts DC. The municipality was able to take advantage of Borrego Solar's integrated solar financing to go solar for zero capital outlay.

Large Commercial

Coast Citrus Distributors

2.1 MW

Borrego Solar developed, built and facilitated financing for three projects for Coast Citrus Distributors, a wholesaler of fruits and vegetables in the United States and Mexico since 1950.

Large Commercial

Town of Methuen Landfill

2.1 MW

Methuen began exploring the idea of a solar farm in late 2009.

Energy Storage

Braintree Electric Light Department

2 MW / 4.2 MWH

Borrego Solar developed, designed, and managed the installation of a 2 megawatt/4.2 megawatt-hour lithium-ion energy storage system for Braintree Electric Light Department (BELD).

Large Commercial

Clif Bar & Company

2 MW

Borrego Solar developed and installed Clif Bar's 2 megawatt ground-mount and canopy solar energy system, which is expected to generate an annual output of more than 3 million kilowatt hours of electricity, the equivalent of the solar power needed to run 280 homes for a year.

Large Commercial

Benicia Unified School District

1.4 MW

Borrego Solar designed and built solar carports at four schools within the Benicia Unified School District. These solar shade structures utilized existing space in school parking lots and playgrounds to generate solar energy that will save the district in energy costs.

Large Commercial

San Diego County Water Authority

1.73 MW

With the use of Borrego Solar's integrated power purchase agreement (PPA), the San Diego County Water Authority will save approximately $1.7 million in energy for no money down.

Community Solar

85 Wauwinet Road

1.3 MW

Borrego Solar developed, designed, and built a 1.3 MW community solar project in Barre, Mass. that is generating clean energy alongside the landowner’s farming operations. Clearway Energy Group owns the project.

Large Commercial

Town of Dartmouth Landfill Solar Project

1.3 MW

With a portfolio of several large-scale commercial solar farms, and more than 100 projects altogether (including many residential rooftop systems) as of May 2013, the South Coast town of Dartmouth had over 9.2 megawatts of solar PV installed.

© 2022 Borrego Solar Systems, Inc.